Gramazio Kohler Research
News
Teaching
Research
Projects
Publications
About
Team
Open Positions
Contact
MAS DFAB: #caschlatsch
Core Course SS
Basic Course AS/SS
Architectural Design V-IX SS
Elective Course SS
Architectural Design V-IX AS
Elective Course AS
Core Course AS
Seminar Week AS
Elective Course SS
Subject Specialisation SS
Computational Design III-IV
Architectural Design V-IX SS
Seminar Week FS
Core Course AS
Architectural Design V-IX AS
Elective course HS22
Seminar Week AS
MAS DFAB: Eggshell Pavilion
Core Course SS
Seminar Week SS
Core Course AS
Seminar Week AS
Workshop USA
Core Course SS
Core Course AS
MAS DFAB: Rapid Clay Formations II
Core Course SS
Seminar Week SS
MAS DFAB: Rapid Clay Formations (Rio)
Core Course AS
Robotic Landscapes III
MAS DFAB: Up Sticks
Seminar Week AS19
Core Course SS
Seminar Week SS
Core Course AS
Architectural Design V-IX AS
MAS DFAB: Rapid Clay Formations
Zero-Waste Geometry
Seminar Week AS
ROB|ARCH 2018 Workshop
MAS DFAB: Gradual Assemblies
Core Course SS
Robotic Landscapes I
Malleable Voxels
MAS DFAB: minijammed
Seminar Week AS
MAS DFAB: Brick Labyrinth
MAS DFAB: Robotic Pavilion
Force-Adaptive Wire Cutting
Spatial Extrusions 2
Spatial Extrusions
Graded Structures 2
Graded Structures
Robotic Wire Cutting Summerschool
Spatial Wire Cutting
Extruded Structures
Remote Material Deposition Installation
Remote Material Deposition
Depth Modulations 2
Design of Robotic Fabricated High Rises 2
Depth Modulations
Complex Timber Structures 2
Complex Timber Structures 1
Robotic Metal Aggregations
Shifted Frames 2
Design of Robotic Fabricated High Rises 1
Shifted Frames 1
Spatial Aggregations 2
Spatial Aggregations 1
Robotic Clay Molding
The Fragile Structure 2
The Fragile Structure 1
Procedural Landscapes 2
Procedural Landscapes 1
Seminar Week
The Interlocking 2
The Interlocking 1
The Sequential Structure 2
The Sequential Structure 1
Explicit Bricks
The Programmed Column 2
The Programmed Column 1
Open Air Theater
Voxels 2
Voxels 1
The Opening 2
The Opening 1
The Sequential Wall 2
The Sequential Wall 1
Acoustics
The Foam
The Resolution Wall
Construction Hoarding
The Dissolved Wall
Domoterra Lounge
The Perforated Wall 2
The Perforated Wall 1
The Programmed Wall
The Oblique Hole
Robot sawing
Drilling
Robot placement

Robot placement
Production phase

Finished structure
Final photos

Final photos
Final photos

Complex Timber Structures 2, ETH Zurich, 2013
Elective Thesis (6 KP)
Following an elective course, a four-week workshop "Complex Timber Structures" offered the students an opportunity to deepen the themes from the semester. The students began with an analysis of contemporary and traditional timber systems and defined node typologies suitable for the digital fabrication process. They followed by designing, programming and building a funnel-shaped wooden structure with a span of 4.5m consisting out of 93 individually cut wooden beams. The cutting of the beams, drilling the holes for the screws and the precise placement of the components within the structure was carried out in a continuous robot-based process. The constraints given by the robot-fabrication process such as length, angle constraints of the components and the assembly sequence of the structure were already incorporated in the planning phase of the design process and have been an integral part of the architectural design.
The teaching project was conducted as an integral part of the 3-year NFP66 research project "Additive Fabrication of Complex Robotic Timber Structures".

Credits:
Gramazio Kohler Research, ETH Zurich

Collaborators: Michael Knauss, Luka Piskorec
Students:

Copyright 2023, Gramazio Kohler Research, ETH Zurich, Switzerland
Gramazio Kohler Research
Chair of Architecture and Digital Fabrication
ETH Zürich HIB E 43
Stefano-Franscini Platz 1 / CH-8093 Zurich

+41 44 633 49 06
Follow us on:
Vimeo | Instagram