Gramazio Kohler Research
News
Teaching
Research
Projects
Publications
About
Team
Open Positions
Contact
MAS DFAB: #caschlatsch
Core Course SS
Basic Course AS/SS
Architectural Design V-IX SS
Elective Course SS
Architectural Design V-IX AS
Elective Course AS
Core Course AS
Seminar Week AS
Elective Course SS
Subject Specialisation SS
Computational Design III-IV
Architectural Design V-IX SS
Seminar Week FS
Core Course AS
Architectural Design V-IX AS
Elective course HS22
Seminar Week AS
MAS DFAB: Eggshell Pavilion
Core Course SS
Seminar Week SS
Core Course AS
Seminar Week AS
Workshop USA
Core Course SS
Core Course AS
MAS DFAB: Rapid Clay Formations II
Core Course SS
Seminar Week SS
MAS DFAB: Rapid Clay Formations (Rio)
Core Course AS
Robotic Landscapes III
MAS DFAB: Up Sticks
Seminar Week AS19
Core Course SS
Seminar Week SS
Core Course AS
Architectural Design V-IX AS
MAS DFAB: Rapid Clay Formations
Zero-Waste Geometry
Seminar Week AS
ROB|ARCH 2018 Workshop
MAS DFAB: Gradual Assemblies
Core Course SS
Robotic Landscapes I
Malleable Voxels
MAS DFAB: minijammed
Seminar Week AS
MAS DFAB: Brick Labyrinth
MAS DFAB: Robotic Pavilion
Force-Adaptive Wire Cutting
Spatial Extrusions 2
Spatial Extrusions
Graded Structures 2
Graded Structures
Robotic Wire Cutting Summerschool
Spatial Wire Cutting
Extruded Structures
Remote Material Deposition Installation
Remote Material Deposition
Depth Modulations 2
Design of Robotic Fabricated High Rises 2
Depth Modulations
Complex Timber Structures 2
Complex Timber Structures 1
Robotic Metal Aggregations
Shifted Frames 2
Design of Robotic Fabricated High Rises 1
Shifted Frames 1
Spatial Aggregations 2
Spatial Aggregations 1
Robotic Clay Molding
The Fragile Structure 2
The Fragile Structure 1
Procedural Landscapes 2
Procedural Landscapes 1
Seminar Week
The Interlocking 2
The Interlocking 1
The Sequential Structure 2
The Sequential Structure 1
Explicit Bricks
The Programmed Column 2
The Programmed Column 1
Open Air Theater
Voxels 2
Voxels 1
The Opening 2
The Opening 1
The Sequential Wall 2
The Sequential Wall 1
Acoustics
The Foam
The Resolution Wall
Construction Hoarding
The Dissolved Wall
Domoterra Lounge
The Perforated Wall 2
The Perforated Wall 1
The Programmed Wall
The Oblique Hole
DELETE THIS PIC AS SOON AS THERE ARE ORIGINAL PICS FROM THE COURSE. THE PIC IS NOT MEANT TO BE USED BY THE MEDIA/PRESS AS IT WAS TAKEN IN ANOTHER CONTEXT FOR AN OLD PROJECT.
Sound of the Future – An Acoustic Wall for IBM, ETH Zürich, 2018
Seminar Week AS18
We are designing an acoustic wall system for the IBM Zurich Research Laboratory in Rüschlikon. Based on the research project acoustic bricks we will learn how to use Rhino Grasshopper to design the wall and control the fabrication at Keller Ziegeleien with an industrial arm robot. The 60 square meter large wall will be permanently installed at IBM’s Client Center welcoming their visitors, clients and partners from December onwards. En route, we will learn about acoustics, digital design and robotic fabrication as well as get a rare insight into new technologies such Artificial Intelligence, Blockchain and quantum computing currently being researched at IBM.

Credits:
Gramazio Kohler Research, ETH Zurich

In cooperation with: IBM Zurich Research Center, Rehau Unlimited Polymer Solutions, Keller Ziegeleien
Client: IBM Zurich Research Center
Collaborators: Hannes Mayer (project lead), Achilleas Xydis
Students:
Selected experts: Marcel Begert (IBM),Jean-Marc Hunziker (IBM), Samuel Cros (Keller Ziegeleien), Jürgen Strauss (Strauss Elektroakustik)

Copyright 2023, Gramazio Kohler Research, ETH Zurich, Switzerland
Gramazio Kohler Research
Chair of Architecture and Digital Fabrication
ETH Zürich HIB E 43
Stefano-Franscini Platz 1 / CH-8093 Zurich

+41 44 633 49 06
Follow us on:
Vimeo | Instagram